Sector
Data centres
Colocation and hyperscale facilities, often with on-site generation or storage. Value depends on secured power, connectivity and contracted capacity.
Typical opportunities
Infrastructure or platform · development to growth · project finance, equity, senior debt and growth capital.
What capital providers look for
- Power: secured grid capacity or on-site generation, and the cost and currency of energy.
- Customers: anchor-tenant contracts, their credit quality and the ramp-up of contracted capacity.
- Design and cost: engineering design, itemised capital costs with supplier quotes and the construction schedule.
- Site: land rights, permits and cooling-water availability.
- Resilience: technology architecture, data governance and cyber-security policies.
- Climate alignment: the emissions of the power supply, energy- and water-efficiency targets, an MRV plan, and whether green-finance tagging applies.
Evidence the system requests
Key items from the due-diligence register.
A selection of the requirements that apply to typical opportunities in this sector, with the module that triggers each one and the gate at which it is first needed. The full list depends on the classification.
| Ref | Requirement | Module | Priority | Gate |
|---|---|---|---|---|
| DR-05-08 | Grid / utility interconnection agreement & capacity confirmation | OFFTAKE | P1 | L3 |
| DR-06-01 | Executed customer / offtake contracts | CORE | P1 | L4 |
| DR-06-10 | Offtaker credit assessment | OFFTAKE | P1 | L3 |
| DR-03-05 | FEED / engineering design package | TECHNICAL | P1 | L3 |
| DR-03-06 | CAPEX itemisation with supplier quotes | TECHNICAL | P1 | L3 |
| DR-03-07 | EPC contract / tender documents | CONSTR | P1 | L4 |
| DR-05-02 | Land title / lease / certificate of occupancy Structurally fatal | LAND | P1 | L2 |
| DR-07-02 | ESIA / EIA (approved) | PERMITS | P1 | L3 |
| DR-15-03 | Technology & systems architecture map | TECH | P2 | L3 |
| DR-15-04 | Data governance, privacy & cyber-security policy | TECH | P2 | L3 |
| DR-17-01 | Insurable-risk schedule (asset, liability, BI, political, credit) | INSUR | P1 | L3 |
Frameworks
Where this evidence is mapped.
| Area | Diligence modules | Frameworks evidence is mapped to |
|---|---|---|
| Environmental & social risk | PERMITS · LAND · CONSTR · IMPACT | IFC Performance Standards 1–8 · Equator Principles · World Bank Group EHS Guidelines |
| Impact management | IMPACT | Operating Principles for Impact Management · IRIS+ metrics · 2X Criteria |
The mapping shows where the evidence a provider needs for its own assessment sits in the onboarding file. It is not a certification and does not replace the provider's own review.