Sector
Wind power
Onshore and offshore wind projects usually sell power under long-term agreements with a utility. Bankability turns on the wind resource, grid access and the strength of the offtaker.
Typical opportunities
Infrastructure or project · development to construction · project finance, senior and mezzanine debt, equity, guarantees and insurance.
What capital providers look for
- Energy yield: an independent P50/P90 assessment from on-site measurement, reconciled where reviews differ.
- Grid connection: an interconnection agreement, capacity confirmation and exposure to curtailment.
- Offtake: bankable power-purchase terms, tariff indexation and currency, and the offtaker's credit standing.
- Land and community: site leases held by the right entity and host-community consent.
- Construction: turbine supply, balance-of-plant and EPC contracts, schedule and warranties.
- Payment security: guarantees or liquidity support where the offtaker is a state utility.
- Climate alignment: avoided emissions against the grid baseline, a measurement, reporting and verification (MRV) plan, and whether carbon credits or finance linked to national climate commitments are relevant.
Evidence the system requests
Key items from the due-diligence register.
A selection of the requirements that apply to typical opportunities in this sector, with the module that triggers each one and the gate at which it is first needed. The full list depends on the classification.
| Ref | Requirement | Module | Priority | Gate |
|---|---|---|---|---|
| DR-03-16 | Resource / yield assessment (P50 / P90) by independent expert | TECHNICAL | P1 | L3 |
| DR-03-10 | Independent technical review (ITR / LTA) | TECHNICAL | P1 | L4 |
| DR-05-08 | Grid / utility interconnection agreement & capacity confirmation | OFFTAKE | P1 | L3 |
| DR-06-09 | Offtake / power-purchase / concession revenue agreement (bankable form) | OFFTAKE | P1 | L3 |
| DR-06-10 | Offtaker credit assessment | OFFTAKE | P1 | L3 |
| DR-05-02 | Land title / lease / certificate of occupancy Structurally fatal | LAND | P1 | L2 |
| DR-05-04 | Host community consent / community MoU | LAND | P1 | L2 |
| DR-07-02 | ESIA / EIA (approved) | PERMITS | P1 | L3 |
| DR-03-07 | EPC contract / tender documents | CONSTR | P1 | L4 |
| DR-17-02 | Political-risk insurance indication (expropriation, CI/T, war, breach) | INSUR | P2 | L4 |
| DR-16-02 | Guarantee term sheet (covered obligation, cover %, tenor, fee) | CE | P1 | L4 |
| DR-21-02 | FX convertibility, transfer & currency-mismatch analysis | COUNTRY | P1 | L3 |
Frameworks
Where this evidence is mapped.
| Area | Diligence modules | Frameworks evidence is mapped to |
|---|---|---|
| Environmental & social risk | PERMITS · LAND · CONSTR · IMPACT | IFC Performance Standards 1–8 · Equator Principles · World Bank Group EHS Guidelines |
| Climate & green finance | IMPACT · TECHNICAL · CE | ICMA Green, Social & Sustainability Bond Principles · ISSB IFRS S2 climate disclosure |
| Public-private partnerships | PPP · COUNTRY | World Bank PPP Reference Guide · host-country PPP and procurement law |
The mapping shows where the evidence a provider needs for its own assessment sits in the onboarding file. It is not a certification and does not replace the provider's own review.