Solar & hybrid

Utility-scale and commercial and industrial solar, often paired with storage or wind. Revenue may come from a utility power-purchase agreement or from private customers, which changes the credit question.

Typical opportunities

Infrastructure or project · development to early operations · project finance, senior debt, equity and, for distributed portfolios, growth capital.

What capital providers look for

  • Yield: an independent irradiation and energy-yield assessment, with degradation assumptions.
  • Equipment: module, inverter and storage supply contracts, performance guarantees and warranties.
  • Offtake: utility power-purchase terms, or the credit quality and contract tenor of commercial customers compared with debt tenor.
  • Grid and land: interconnection capacity and site rights held by the right entity.
  • Currency: exposure where revenue is in local currency, such as naira in Nigeria, and debt is in hard currency.
  • Climate alignment: a greenhouse-gas baseline for the grid or diesel generation displaced, an MRV plan, and whether carbon credits or finance linked to national climate commitments are relevant.
Evidence the system requests

Key items from the due-diligence register.

A selection of the requirements that apply to typical opportunities in this sector, with the module that triggers each one and the gate at which it is first needed. The full list depends on the classification.

RefRequirementModulePriorityGate
DR-03-16Resource / yield assessment (P50 / P90) by independent expert TECHNICALP1L3
DR-03-09Performance guarantees & warranties TECHNICALP2L4
DR-03-06CAPEX itemisation with supplier quotes TECHNICALP1L3
DR-06-09Offtake / power-purchase / concession revenue agreement (bankable form) OFFTAKEP1L3
DR-06-10Offtaker credit assessment OFFTAKEP1L3
DR-05-08Grid / utility interconnection agreement & capacity confirmation OFFTAKEP1L3
DR-05-02Land title / lease / certificate of occupancy Structurally fatalLANDP1L2
DR-07-02ESIA / EIA (approved) PERMITSP1L3
DR-03-07EPC contract / tender documents CONSTRP1L4
DR-21-02FX convertibility, transfer & currency-mismatch analysis COUNTRYP1L3
DR-11-02FX & interest-rate hedging strategy DEBTP2L4
Frameworks

Where this evidence is mapped.

AreaDiligence modulesFrameworks evidence is mapped to
Environmental & social riskPERMITS · LAND · CONSTR · IMPACTIFC Performance Standards 1–8 · Equator Principles · World Bank Group EHS Guidelines
Climate & green financeIMPACT · TECHNICAL · CEICMA Green, Social & Sustainability Bond Principles · ISSB IFRS S2 climate disclosure

The mapping shows where the evidence a provider needs for its own assessment sits in the onboarding file. It is not a certification and does not replace the provider's own review.