Our standards
Evidence, capital reconciliation, independent review and governance held to one rulebook. These rules are enforced by formula in every onboarding file, so they cannot be skipped under deadline pressure.
No one can make a material diligence requirement disappear through an unchecked N/A, a module switch, a blank field or a manual override.
That applies to the company, the sponsor, the reviewer and us. Every requirement is either positively cleared, by an independent Pass or a validated N/A, or counted as outstanding.
Six rules that do most of the work.
Receipt is not diligence
Submitting a document records receipt: who submitted it, when, the link and any expiry date. Only a named reviewer who is not the submitter can conclude that it passes. Downgrades are allowed and logged.
Nothing disappears unchecked
A company-declared N/A stays outstanding until a reviewer validates it with a rationale, an independent assessor and a date. Module overrides need a rationale and an approver independent of the deal lead. Out-of-scope items stay listed and counted.
Funding reconciles to uses
The headline ask is tested against a bottom-up requirement built from every use of funds, each with an evidence class. Variance, contingency and coverage are tested at each gate.
Credit enhancement is not cash
Guarantees, insurance and other credit enhancement are shown at nominal value but never reduce the funding gap unless they contractually substitute a funding requirement and the substitution is evidenced.
Independent review, auditable decisions
Preparer, reviewer and approver are separate roles. Four-eyes rules are enforced by formula, and every determination is written to an append-only audit log.
Mappings are not certifications
Diligence modules are mapped to the frameworks capital providers use. The mapping shows where evidence sits; it is not a certification and does not replace a provider's own review.
Only two statuses clear an item.
Everything else stays outstanding and counts against the gate.
| Diligence status | Meaning | Effect |
|---|---|---|
| Pass | Received, reviewed as satisfactory by a named reviewer who is not the submitter, on a recorded date. | Cleared |
| Pass — N/A validated | The reviewer validated a not-applicable claim with a rationale, an independent assessor and a date. This is the only way an applicable item can be cleared without a document. | Cleared |
| N/A claimed — unvalidated | The company said the item does not apply. It stays outstanding, and is critical for priority-one items. | Outstanding |
| Invalid N/A | N/A marked as validated, but the rationale, assessor or date is missing, or the assessor is the submitter. | Outstanding |
| Received, not satisfied | Received but not yet reviewed, unconfirmed, inadequate, incomplete, contradictory or requiring corrective action. | Outstanding |
| Expired | A time-bound document is past its expiry date at the review date. | Outstanding |
| Partially available | The company is still producing the evidence. | Outstanding |
| Critical missing · Gap | A priority-one or Tier-1 DFI item has not been received (critical). Other items not yet received are gaps. | Outstanding |
| Not yet applicable | The lifecycle stage means the evidence cannot exist yet. It re-activates automatically when the stage changes. | Tracked |
| Out of scope | The module does not apply under the engine, or an approved override removed it. It is still listed and counted. | Counted |
Evidence mapped to the frameworks capital providers already use.
| Area | Diligence modules | Frameworks evidence is mapped to |
|---|---|---|
| Environmental & social risk | PERMITS · LAND · CONSTR · IMPACT | IFC Performance Standards 1–8 · Equator Principles · World Bank Group EHS Guidelines |
| Impact management | IMPACT | Operating Principles for Impact Management · IRIS+ metrics · 2X Criteria |
| Climate & green finance | IMPACT · TECHNICAL · CE | ICMA Green, Social & Sustainability Bond Principles · ISSB IFRS S2 climate disclosure |
| Blended & concessional finance | IMPACT · CE | OECD DAC Blended Finance Principles · DFI Enhanced Principles for Blended Concessional Finance |
| Integrity, KYC & sanctions | CORE · SPONSOR · CORP | FATF Recommendations · OECD Anti-Bribery Convention · sanctions screening |
| Governance | CORE · CORP · EQUITY | IFC Corporate Governance Methodology |
| Financial information & model | FIN-HIST · MODEL · DEBT | IFRS financial reporting · independent model review · DSCR and LLCR covenant conventions |
| Public-private partnerships | PPP · COUNTRY | World Bank PPP Reference Guide · host-country PPP and procurement law |
| National climate commitments | IMPACT · TECHNICAL | NDC measure and action tagging · greenhouse-gas baseline · MRV plan |
| Carbon markets | IMPACT · CE | Paris Agreement Article 6 authorisation status · national carbon registry · ICVCM Core Carbon Principles |
The mapping shows where the evidence a provider needs for its own assessment sits in the onboarding file. It is not a certification and does not replace the provider's own review.
37 controls that recalculate automatically.
Any flag must be resolved or explicitly accepted by the reviewer before a gate is assessed.
| Control check | Severity |
|---|---|
| DD rows missing system formulas (inserted / overwritten rows) | Critical |
| Register rows missing system formulas (Assessment, Assumptions, Risks, Capital Stack) | Critical |
| DD items beyond the pre-wired range (row > 1500) | Critical |
| Items missing mandatory classification (module / priority / level / perspective) | Critical |
| Unknown modules | Critical |
| Expired documents | Critical |
| Invalid or unvalidated N/A (incl. company self-declared) | Critical |
| Contradictory items | Critical |
| Reviewer is also the submitter (four-eyes breach) | Critical |
| Capital-structure reconciliation exceptions | Critical |
| Credit enhancement claimed as funding without evidence | Critical |
| Lifecycle stage changed since last gate review | Critical |
| Profile mandatory fields missing / non-numeric | Critical |
| Reconciliation invariant: P1 universe = applicable + out of scope + NYA (all levels) | Critical |
| Reconciliation invariant: every DD item has exactly one diligence status | Critical |
| Formula errors in key outputs (Gates, Recon, Model, Dashboard) | Critical |
| Duplicate item refs | Major |
| Documents expiring within warning window | Major |
| Received but not reviewed | Major |
| Received but inadequate / incomplete / unverified / corrective action | Major |
| Determinations not recorded in the audit log | Major |
| Overdue actions (DD + Actions + Assessment + Assumptions) | Major |
| Blockers / critical items without an owner | Major |
| Unanswered HIGH-materiality assessment questions | Major |
| Assessment escalations lacking owner/due, unsigned verifications, pending downgrades | Major |
| RED assumptions open | Major |
| Risks unscored or high without treatment / instrument | Major |
| Out-of-range values (risk P/I, model inputs, negative / non-numeric amounts) | Major |
| Engine running fail-safe (type blank or without rule) | Major |
| Invalid module overrides (ignored) | Major |
| Gate exceptions in force | Major |
| Screening model: long-term debt profile unsustainable / below covenant | Major |
| Same document linked to several items | Minor |
| Stale reviews (older than parameter) | Minor |
| Uses lines without amount or evidence class | Minor |
| Module overrides in force (manual scope changes) | Minor |
| Audit-log entries referencing unknown item refs | Minor |